Architect reviewing fire-rated glass specifications
Technical Guide May 18, 2026

How to Specify Fire-Rated Glass: A Decision Guide for Architects, Engineers, and Contractors

Confused between E30 and EI60? Monolithic vs insulated? AS1530.4 vs BS476? Learn exactly how to specify fire-rated glazing for any building type.

Read Article →
AS 1530.4 compliance documentation and fire test reports
Compliance May 20, 2026

AS 1530.4 Documentation That Won't Hold Up Your Project

How EI-rated glazing with AS 1530.4 test evidence eliminates compliance delays on Class 2–9 NCC 2022 projects. Technical breakdown for fire engineers and façade specifiers.

Read Article →
Fire-rated glazing installation on Australian construction site
Installation May 25, 2026

Australian Fire-Rated Glazing Installation Field Guide

Frame anchorage, cavity fill documentation, fusible link testing, and the six details Australian certifiers flag most during inspection. Full compliance pathway from substrate to AFSS.

Read Article →
Fire-rated glazing in Australian school building corridor
NCC 2025 May 27, 2026

Specifying Fire-Rated Glazing for Australian Schools: NCC 2025 Class 9b Requirements

Class 9b school buildings have unique fire safety constraints — children can't self-evacuate at adult speed. A practical FRL selection guide with state-by-state adoption timeline.

Read Article →
NATSPEC worksections compliance pathway for fire-rated glazing
Compliance May 28, 2026

How NATSPEC Worksections Reference Fire-Rated Glazing — and What It Means for Your Specification

NATSPEC distributes fire-rated glazing requirements across three linked TECHnotes and at least three worksections. Learn how PRO 006, DES 020, and GEN 034 form a complete compliance framework for Australian specifiers.

Read Article →